
Project Details
Location: Westbourne, Bournemouth
Customer: DMA Property Solutions Ltd
Duration: 20 mins
Project Description
DMA Property Solutions Ltd contacted Boomdob when they needed a quick but skilled solution to install a vent cover over an extractor fan outlet on the third floor of a residential block of flats. Their client’s flat was located high up at the front of the building, directly above the main entrance.
Due to the layout of the site, traditional access options were not viable. Scaffolding was ruled out as it would have blocked the main entrance to the flats, creating disruption and access issues for residents. The job was also too quick and low-cost to justify the time and expense of a scaffold installation.
An ali tower was also considered, but uneven ground and stone steps at the building’s entrance posed both a safety risk and a potential for damage - something neither DMA nor their client wanted to risk
The Solution
Boomdob arrived on-site with our electric cherry picker, which provided safe, quiet, non-disruptive access to the third floor without interfering with resident access. Within 20 minutes, the vent was securely fitted, and the job completed safely and efficiently
By using Boomdob, DMA avoided unnecessary delays, saved money on scaffolding, and protected the building’s entrance from damage. It was a simple task—made easy with the right experience, equipment, and at-height access expertise
Cheers DMA Property Solutions
If you're a property services or maintenance company with quick at-height jobs that don’t justify the cost or hassle of scaffolding, Boomdob can handle them for you using our cherry picker. With over 30 years experience in commercial and industrial roofing, cladding, and building envelope, Dob is fully skilled to complete the work for you. Contact us now for a free, no-obligation quote











